Return of radioactive sources
Notification form for all countries except Germany
English | ZIP | 408.8 KB
Download nowOn every package the UN Number for Dangerous Goods must be indicated as well as the proper description of contents required in accordance with the IATA and ADR regulations. The packing has to be in compliance to the IATA regulations (IATA DGR Type A packages). Further information relating to this can be taken from the ADR and IATA regulations.
We only accept radioactive material originating from Berthold, which has been used in conjunction with one of our measuring systems. The radioactive material and the shielding may not be damaged in any way and must have a valid leak test certificate. Additionally we need the source certificates. If the recommended working life (RWL) of the source is exceeded the maximum age of the leak test is 1 year. It is absolutely necessary that the radioactive material sent to us will be adequately labeled with your name, address and our reference number. Radioactive material may only be returned to us after receiving authorization from Berthold. Any material returned to Berthold without prior authorization will not be accepted by Berthold.
The shipment will only be released if, we received pictures indicating clearly:
Additionaly we need the documentation - commercial invoice, shipper’s declaration (DGD), notification form - to prepare our import documentation in advance. The data for each source (activity, nuclide, if necessary source number) must correspond on each document! To avoid additional costs for storage at the airport in Germany the shipment should arrive beginning of each week Monday to Wednesday. We reserve the right to charge avoidable costs for storage. Copy of attached notification form and leak test certificate must be attached directly at the shipment, the original must accompany the shipping papers. Prior to this, the documents have to be sent by E-Mail in advance to our order processing. The confirmation of source return will be sent approximately 3 – 4 weeks upon receipt of the sources.
Hersteller | Isotope | Maximum age | Other information |
Berthold | Am-241 | 3 a | Special form certificate required |
Berthold | Am-241/Be | 3 a | Special form certificate required |
Berthold | Cm-244 | 3 a | Special form certificate required |
Berthold | Co-60 | 10 a | |
Berthold | Cs-137 | 10 a |
Notification form for all countries except Germany
English | ZIP | 408.8 KB
Download now